Northeast Paving teams demolished the existing Randall Bridge over the West Branch of the Mattawamkeag River, located less than one mile northwest of Church Street in Island Falls, Maine. In addition to washing and sealing the bridge, teams installed 67 linear feet of Bridge Rail, installed two drainage structures, and improved five channels. The project is scheduled for completion in the fall of 2019.