Asphalt Plant Locations We're Hiring

AT A GLANCE

  • Project Name: Pennsylvania Turnpike Resurfacing
  • Location: Milepost
  • Duration: 22 months
  • Project Type: Roadways
  • Status: Ongoing

Pennsylvania Turnpike Resurfacing

This contract provides for resurfacing of the Turnpike roadway. Work will be accomplished by milling andpaving the Turnpike roadway with superpave wearing course, andreplacing Sonic Nap Alert Patterns. Workwill also include shoulder reconstruction, guide rail end treatment update, repairing and replacement ofinlets and wide area elimination. This contract also provides for bridge repairs which includes Class AAconcrete repairs and type 2 latex modifiedconcrete deck patching. Additional work includes Zelienopleservice plaza concrete pavement patching and access road full depth reconstruction, access ramp millingand paving at Mileposts 21.4and 21.9, EB and milling and paving of the Warrendale Toll Plaza and accessroads.

 

Specs:

13,432 CY of Excavation
523,895 SY Milling of Existing Bituminous Pavement, Various Depths
52,690 TONS of Superpave Wearing Course
9,211 TONS of Superpave  Binder Course
1,320 LF Concrete Median Barrier, 48”
3,578 LF of Rock Armor
5,529 CY Rock Armor, Modified